ohne-makler
Print exposé
This listing has been automatically translated.

Modernized detached house and children's paradise - RESERVED.

55239 Gau-Odernheim – Rheinland-Pfalz
445.000 €
5
Room
133 m²
Living Area
273 m²
Plot Area
Private offer
House
Semi-detached house

This attractive semi-detached house offers a living space of approximately 133 square meters, with a total of five rooms spread over three levels. The property boasts high-quality interior finishes and was last renovated in 2025, ensuring a modern standard of living. The property will be available from approximately November 1, 2026. In addition to the living space, the house features two bathrooms and a separate guest toilet. A large storage room provides additional storage space. A private garage, located directly at the house, is available for parking your vehicle. The private parking area has enough space for two cars. The roof of the garage has been converted into a usable space and is insulated. Large, double-insulated attic spaces are available, with potential for expansion. The windows are double-glazed and fitted with insect screens. The semi-detached house has been extensively renovated and modernized since 2017:
2017: New Velux skylight with electric blinds, new water heater.
2020: Aluminum terrace roof with clear glass, electric sun protection.
2021: Both bathrooms were completely renovated with high-quality materials (Villeroy flooring and tiles, as well as shower).
2021: New gas boiler.
2023: Pellet stove (8kW Haas+Sohn), controllable via app.
2023: New garden fence.
2024: New front door and terrace door, triple-glazed.
2024: The parking area was repaved.
2025: New rust-resistant vinyl flooring on the upper floor.
2025: Elevated house (on stilts).
2025: Sauna with open fireplace (9kW), still under warranty.
2026: New cooktop.

Are you interested in this house?

Object Number
OM-491170
Object Class
House
Object Type
Semi-detached house
Is occupied
Vacant
Handover from
Jan. 1, 2027

Purchase price & additional costs

purchase price
445.000 €
Purchase additional costs
approx. 28,347 €
Total costs
approx. 473,346 €

Breakdown of Costs

Purchase price 445.000 €
Real estate transfer tax 22,250 € (5.00%)
Notary costs 4,034 € (0.91%)
Land register entry 2,063 € (0.46%)
Broker commission 0€ (0%)

* Costs for notary and land register were calculated based on the fee schedule for notaries. Assumed was the notarization of the purchase at the stated purchase price and a land charge in the amount of 80% of the purchase price. Further costs may be incurred due to activities such as land charge cancellation, notary escrow account, etc. Details of notary and land registry costs

Does this property fit my budget?

Estimated monthly rate: 1,863€

More accuracy in a few seconds:

By providing some basic information, the estimated monthly rate is calculated individually for you. For this and for all other real estate offers on ohne-makler.net

Based on equity 20% of the purchase price plus the purchase incidental costs / 10 years fixed interest rate / 2% initial repayment / Effective interest rate 4.28%

Details

Condition
Rehabilitated
Number of floors
1
Usable area
70 m²
Bathrooms (number)
2
Bedrooms (number)
3
Number of garages
1
Number of parking lots
2
Flooring
Tiles, Vinyl / PVC
Heating
Central heating
Year of construction
1997
Equipment
Terrace, Garden, Basement, Full bath, Shower bath, Sauna, Fitted kitchen, Guest toilet, Fireplace
Infrastructure
Pharmacy, Grocery discount, General practitioner, Kindergarten, Primary school, Middle school, Public transport

Information on equipment

The fitted kitchen is included in the price and will be sold along with the property.

Location

The street, which is a 30 km/h zone, is very close to the new development area. The kindergarten is within a 10-minute walk, and the elementary school is located 1.2 km away.

Location Check

Child Friendliness
Health
Shopping
Eating Out
Sports
Culture
Nightlife
Nature
Public Transport

Energy

0 25 50 75 100 125 150 175 200 225 ≥250
Final energy consumption
64.38 kWh/(m²a)
Energy efficiency class
C
Energy certificate type
Consumption certificate
Main energy source
Gas

Miscellaneous

Broker inquiries not welcome! According to § 7 UWG, unsolicited contact by brokers without the express consent of the recipient is prohibited!

Send a message directly to the seller

Questions about this house? Show interest or arrange a viewing appointment?

Click here to send a message to the provider:

Offer from: Frau Tapu