- Immobilien
- Baden-Württemberg
- Rems-Murr-Kreis
- Weinstadt
- Immediately available: Well-maintained 3-room apartment with underground parking and a large southwest-facing balcony, located in a desirable area.
This page was printed from:
https://www.ohne-makler.net/en/property/462820/
Immediately available: Well-maintained 3-room apartment with underground parking and a large southwest-facing balcony, located in a desirable area.
71384 Weinstadt (Endersbach) – Baden-WürttembergThis spacious 3-room apartment is located on the 2nd floor of a well-maintained apartment building in a desirable residential area of Weinstadt-Beutelsbach. A passenger elevator provides convenient access to the apartment. Covering approximately 79 square meters, the apartment features a well-designed layout with a variety of uses. The heart of the apartment is the generous living room, which has direct access to the newly renovated southwest-facing balcony, where you can enjoy the afternoon and evening sun. In addition to the spacious bedroom, there is another room available, which is ideal as a children's room, guest room, or home office. The large kitchen offers ample space and is already equipped with an older built-in kitchen. The interior bathroom features both a bathtub and a separate shower. A separate toilet complements the living space. The apartment is largely in its original condition, making it an ideal base for buyers who want to realize their own living ideas and needs. A private storage room in the basement and a parking space in the underground garage complete this attractive offer. The apartment is vacant and can be taken over with short notice.
Are you interested in this apartment?
|
Object Number
|
OM-462820
|
|
Object Class
|
Apartment
|
|
Object Type
|
Apartment
|
|
Is occupied
|
Vacant
|
|
Handover from
|
By arrangement
|
Purchase price & additional costs
|
purchase price
|
259.000 €
|
|
Purchase additional costs
|
approx. 16,725 €
|
|
Total costs
|
approx. 275,724 €
|
|
HOA fee
|
246 €
|
Breakdown of Costs
* Costs for notary and land register were calculated based on the fee schedule for notaries. Assumed was the notarization of the purchase at the stated purchase price and a land charge in the amount of 80% of the purchase price. Further costs may be incurred due to activities such as land charge cancellation, notary escrow account, etc. Details of notary and land registry costs
Does this property fit my budget?
Estimated monthly rate: 1,008€
More accuracy in a few seconds:
By providing some basic information, the estimated monthly rate is calculated individually for you. For this and for all other real estate offers on ohne-makler.net
Details
|
Condition
|
In need of renovation
|
|
Level
|
2nd floor
|
|
Bathrooms (number)
|
1
|
|
Number of underground garages
|
1
|
|
Flooring
|
Parquet
|
|
Heating
|
Central heating
|
|
Year of construction
|
1972
|
|
Equipment
|
Balcony, Basement, Elevator, Full bath, Fitted kitchen, Guest toilet
|
|
Infrastructure
|
Pharmacy, Grocery discount, General practitioner, Kindergarten, Primary school, Secondary school, Middle school, High school, Comprehensive school, Public transport
|
Location
The apartment is located on Ziegeleistraße in the popular Beutelsbach district of Weinstadt. The location offers a pleasant living environment combined with excellent infrastructure and convenient access to everyday amenities.
The Beutelsbach S-Bahn station is easily accessible on foot, providing direct connections to Stuttgart, Waiblingen, and Schorndorf. This makes the location particularly suitable for commuters.
Shops for daily needs, bakeries, doctors, and pharmacies are located in the immediate vicinity. Schools and childcare facilities are also easily accessible. Nearby are, among other things, the Weinstadt education center and various types of schools.
The area's high recreational value is particularly attractive. The vineyards of the Remstal valley, numerous hiking and cycling trails, and the picturesque landscape make Weinstadt a popular place to live for families, professionals, and those seeking tranquility.
The combination of good transport links, established infrastructure, and proximity to nature makes this location a consistently sought-after residential address in the Remstal valley.
Location Check
Energy
|
Final energy consumption
|
142.00 kWh/(m²a)
|
|
Energy efficiency class
|
E
|
|
Energy certificate type
|
Consumption certificate
|
|
Main energy source
|
District heating
|
Miscellaneous
Diese Seite wurde ausgedruckt von:
https://www.ohne-makler.net/en/property/462820/