- Properties
- Bayern
- Kreis Bayreuth (Stadt)
- Bayreuth
- Bright 2-room apartment with historical charm - modernized building with fitted kitchen and daylight bathroom.
This page was printed from:
https://www.ohne-makler.net/en/property/498044/
Bright 2-room apartment with historical charm - modernized building with fitted kitchen and daylight bathroom.
St. Georgen 25, 95448 Bayreuth – BayernA house from 1740, brought up to modern standards.
The house at St. Georgen 25 was built in 1740 and served as a guesthouse for many years. It underwent a comprehensive renovation in 2019/2020. Today, it comprises three residential units and one commercial unit (a beauty salon on the ground floor). The 2-room apartment offered here is located on the first floor. From the hallway, which has space for a wardrobe and coat rack, you enter the open-plan living area with a built-in kitchen. Living, relaxing, and cooking in a bright, historic building with many windows and plenty of light. You will find a separate bedroom with a small dressing area and a shower room with a window. The apartment features oak parquet flooring and tile flooring, and has panel doors. The built-in kitchen is located along one wall and includes a ceramic hob, oven, extractor fan, stainless steel sink, dishwasher, and a small refrigerator, fulfilling all your needs. The countertop and backsplash have a concrete-look finish, combining the charm of a historic building with modern elements. The built-in kitchen is included in the rental price. The wooden-framed windows with skylights are from the renovation. From the living room, you have a view of the monastery church and the street, offering a beautiful view of this well-preserved district of Bayreuth, St. Georgen. The property is managed by a property management company. A caretaker service and stairwell cleaning are provided. Upon request, the apartment can be offered furnished for a small additional fee. Only two cabinets would need to be added. Regarding parking:
- Street parking with a parking disc (2 hours).
- Free parking spaces behind the church.
- No dedicated parking space.
The apartment will be available from November 15, 2026. Please note that pets are not allowed in this property.
Are you interested in this apartment?
|
Object Number
|
OM-498044
|
|
Object Class
|
Apartment
|
|
Object Type
|
Apartment
|
|
Handover from
|
Nov. 15, 2026
|
Rent & additional costs
|
Cold rent
|
755 € (plus additional costs)
|
|
Heating costs
|
165 €
|
|
Additional costs without heating costs
|
80 €
|
|
Sum of additional costs/heating costs
|
245 €
|
|
Deposit
|
2,265 €
|
Details
|
Condition
|
Well-kept
|
|
Monument protection object
|
Yes
|
|
Number of floors
|
2
|
|
Level
|
1st floor
|
|
Usable area
|
2 m²
|
|
Bathrooms (number)
|
1
|
|
Bedrooms (number)
|
1
|
|
Flooring
|
Parquet, Tiles
|
|
Heating
|
Central heating
|
|
Year of construction
|
1740
|
|
Equipment
|
Basement, Shower bath, Fitted kitchen
|
|
Infrastructure
|
Pharmacy, Grocery discount, General practitioner, Kindergarten, Primary school, Secondary school, Middle school, High school, Comprehensive school, Public transport
|
Information on equipment
Please understand that we can only consider inquiries from individuals who provide us with their full contact information, including their address, phone number, and email address.
Location
St. Georgen, opposite the monastery church
The property is located in the St. Georgen district of Bayreuth, directly opposite the monastery church. The street is quiet, yet the city center is still close by. A bus stop is located right next to the house, and other stops are within walking distance. The main train station is just a few minutes away. Via the B2 road, you can easily access the A9 motorway at the Bayreuth-Nord junction. The apartment does not include a dedicated parking space. You can park for free in front of the house using a parking disc for up to two hours. There are also additional free parking spaces behind the church. The street is paved with cobblestones, which is part of the neighborhood's character, but it can be noticeable when using a rolling suitcase or stroller.
AT A GLANCE:
- No dedicated parking space.
- Free parking in front of the house (up to 2 hours with parking disc).
- Additional free parking spaces behind the church.
- Bus stop next to the house.
- Main train station within a few minutes.
- Easy access to the B2 road and the A9 motorway (Bayreuth-Nord).
- Cobblestone street (can be noticeable with luggage or strollers).
Location Check
Energy
|
Energy efficiency class
|
D
|
|
Energy certificate type
|
Demand certificate
|
|
Main energy source
|
Gas
|
|
Final energy demand
|
126.20 kWh/(m²a)
|
Miscellaneous
Imprint:
Juliane Bachmann Immobilien
Bachmann Konzepte GmbH
Glockenstraße 3a
95447 Bayreuth
Tel: 0160 90990921
Registration number: HRB 6721
Competent registration court:
Amtsgericht Bayreuth
Wittelsbacherring 22
95444 Bayreuth
The managing director authorized to represent the company is: Ms. Juliane-Christin Bachmann.
Value-added tax:
Value-added tax identification number according to §27 a of the German VAT Act: DE 316922922
Requirement for a license according to § 34 of the German Trade, Commerce and Industry Regulation Act (Gewerbeordnung):
License according to §34c of the German Trade, Commerce and Industry Regulation Act, issued by the City of Bayreuth,
Department for Public Order,
Luitpoldplatz 13,
95444 Bayreuth.
Supervisory authority:
IHK (Chamber of Industry and Commerce) for Munich and Upper Bavaria
Max-Joseph-Straße 2
80333 Munich
Existing professional indemnity insurance: Policy number: GHV 70/0450/7057373/421 with
Allianz Versicherungs-AG, 10900 Berlin.
Professional association: IHK.
Consumer dispute resolution/Universal Mediation Center
We participate in a dispute resolution process before a consumer mediation center. The responsible body is the Universal Mediation Center of the Zentrum für Schlichtung e.V., Straßburger Straße 8, 77694 Kehl am Rhein.
Broker inquiries not welcome! According to § 7 UWG, unsolicited contact by brokers without the express consent of the recipient is prohibited!
Topic portals
Diese Seite wurde ausgedruckt von:
https://www.ohne-makler.net/en/property/498044/
Grundriss zur Wohnung Nr. 2