- Immobilien
- Brandenburg
- Kreis Oberhavel
- Hohen Neuendorf
- Modernized semi-detached house with two apartments, situated on a 403.50 square meter plot, including a garage.
This page was printed from:
https://www.ohne-makler.net/en/property/483377/
Modernized semi-detached house with two apartments, situated on a 403.50 square meter plot, including a garage.
Bästleinsstraße 17, 16540 Hohen Neuendorf – BrandenburgPlease also refer to the object number OM-483273 for this offer.
For sale is a semi-detached house with two living units, each with a bathroom/shower, a kitchen, and two rooms. The house was built in 1909 and underwent a major renovation in the 1990s. It is suitable for shared accommodation for three people (if the kitchen on the upper floor is removed/converted). In that case, it would offer three bedrooms, two living areas, a kitchen, and one bathroom with a toilet, and another bathroom with a shower. The property is located on the street with the least traffic in the town of Hohen Neuendorf. The existing gas boiler with a natural gas connection and a 60-liter storage tank was replaced in 2021. An up-to-date energy performance certificate, issued in July 2026, is available. The house is fully basemented, and the basement can be accessed from the ground floor apartment internally and by the resident of the upper floor apartment from the outside. The basement contains a utilities room, a laundry room with a washing machine, dryer, and sink, a drying cellar, and a fuel storage cellar. Both apartments have approved fireplaces that can heat a second room. The bathroom fixtures, facade, and roof were renovated in 2018. The ground floor and some of the windows on the upper floor are equipped with security shutters, and the basement windows have security grilles.
Basement:
6.95 m x 7.15 m = 49.69 sq m
1. Basement room: 3.30 m x 3.87 m = 12.77 sq m
2. Basement room: 4.85 m x 3.00 m = 14.55 sq m
3. Basement room: 3.95 m x 3.60 m = 14.22 sq m
4. Utility room: 2.50 m x 3.00 m = 7.50 sq m
Ground floor:
Kitchen: 4.85 m x 3.00 m = 14.55 sq m
Living room: 5.18 m x 3.90 m = 20.20 sq m
Bedroom: 4.85 m x 3.00 m = 14.55 sq m
Upper floor:
Kitchen: 3.30 m x 3.87 m = 12.77 sq m
Living room: 5.18 m x 3.90 m = 20.20 sq m
Bedroom: 3.30 m x 4.00 m = 13.20 sq m
Attic/Studio: 7.77 m x 6.00 m = 46.62 sq m
In addition, the property includes a garage, a carport, a parking space for bicycles/electric bicycles/scooters with a 220V connection, and a front garden.
Are you interested in this offer?
|
Object Number
|
OM-483377
|
|
Object Class
|
Plot
|
|
Object Type
|
Living
|
|
Handover from
|
By arrangement
|
Purchase price & additional costs
|
purchase price
|
350.000 €
|
|
Purchase additional costs
|
approx. 27,758 €
|
|
Total costs
|
approx. 377,757 €
|
Details
|
Development status
|
Fully developed
|
|
Infrastructure
|
Pharmacy, Grocery discount, General practitioner, Kindergarten, Primary school, Secondary school, Middle school, High school, Comprehensive school, Public transport
|
Location
The property is located in a green area just outside of Berlin, also known as Hohen Neuendorf, specifically in the district of Niederheide. The property is situated on a quiet residential street with minimal traffic. Despite its peaceful location, all essential amenities are within a 3-kilometer radius, easily accessible on foot or by bicycle.
Local Amenities:
Butcher / Baker: approximately 450 meters
Daycare center: approximately 600 meters
Elementary school: approximately 400 meters
Secondary school / Gymnasium: approximately 1.7 kilometers
Sports facilities: Niederheide sports field, approximately 350 meters
Bus stop: approximately 350 meters
Long-distance train station: Nordbahnhof, approximately 1.2 kilometers
S-Bahn (suburban train): S1, S7, approximately 2.4 kilometers
Dentists: 12 practices in the city center, approximately 3 kilometers
General practitioners: various practices in the city center, approximately 3 kilometers
Restaurants: City center / Niederheide, approximately 1 to 2.6 kilometers
Kaufland (hypermarket), pharmacy: approximately 1.4 kilometers
LIDL (supermarket): approximately 1.3 kilometers
Aldi, DM, Rewe (supermarkets): approximately 2.6 kilometers
Automotive repair shop: approximately 1.3 kilometers (type unspecified)
Location Check
Miscellaneous
The front building is currently rented until September 30, 2027. A sublease is possible for 30 to 36 months (5 or 6 semesters) with a local university (HPol BB).
The property mentioned above is bordered on two sides by a "Hammergrundstück" (a type of property boundary). The rear property also belongs to the seller and is occupied by a single-family home, which is currently inhabited by the seller.
A recent valuation report is available (as of July 2026).
Broker inquiries not welcome! According to § 7 UWG, unsolicited contact by brokers without the express consent of the recipient is prohibited!
Topic portals
Diese Seite wurde ausgedruckt von:
https://www.ohne-makler.net/en/property/483377/
Katasterkarte
Energieausweis Stand 07.2026