ohne-makler
Print exposé
This listing has been automatically translated.

Beachfront 3-room apartment in a quiet, dead-end street – with 2 balconies and a small view of the water.

Dethleffsenweg 3, 24960 Glücksburg ( Ostsee ) (Sandwig) – Schleswig-Holstein
390.000 €
3
Room
93 m²
Living Area
Private offer
Apartment

Just a few steps from the Flensburg Fjord, you'll find a high-quality apartment perfect for those who love the sea. Whether it's sailing, walks along the promenade, or relaxing weekends on the Baltic Sea, here you're not just buying an apartment, but a home in one of the most beautiful locations in Glücksburg. The apartment, approximately 93 square meters in size, is located on a high floor of a well-maintained apartment building with six units. It impresses with its well-thought-out layout, open spaces, and comfort. The heart of the apartment is the spacious living room with floor-to-ceiling windows that can be fully opened. From here, you can access the square, sunny south-facing balcony (6 square meters). From here, you have a view of the idyllic Schwennau valley. A second balcony, accessible from the kitchen and facing north, offers a glimpse of the fjord. The apartment features two well-proportioned bedrooms, one of which also has access to the south-facing balcony. The apartment offers exceptional comfort, particularly in its two bathrooms:
- a spacious bathroom with a bathtub and shower.
- a guest bathroom, also with a shower.
- Underfloor heating in both bathrooms.
The high-quality kitchen features branded Miele appliances and has access to a pantry with a washing machine connection. Both balconies are finished with high-quality Bangkirai wood. The apartment itself features porcelain tiles in a wood-look finish. The apartment also includes:
- a garage with an electric roller door and electrical connection, offering additional storage space.
- a spacious cellar room.
- a communal drying room.
The apartment was previously rented out for a cold rent of €1254 and is being sold vacant. It can be used as a primary residence, an exclusive second home, or as an investment property. The apartment is located on a high floor and is not accessible for people with disabilities. I look forward to hearing from you and will contact you shortly.
Sincerely,
Ulla Dirks

Are you interested in this apartment?

Object Number
OM-437344
Object Class
Apartment
Object Type
Apartment
Is occupied
Vacant
Handover from
Immediately

Purchase price & additional costs

purchase price
390.000 €
Purchase additional costs
approx. 30,721 €
Total costs
approx. 420,720 €
HOA fee
750 €

Breakdown of Costs

Purchase price 390.000 €
Real estate transfer tax 25,350 € (6.50%)
Notary costs 3,558 € (0.91%)
Land register entry 1,813 € (0.46%)
Broker commission 0€ (0%)

* Costs for notary and land register were calculated based on the fee schedule for notaries. Assumed was the notarization of the purchase at the stated purchase price and a land charge in the amount of 80% of the purchase price. Further costs may be incurred due to activities such as land charge cancellation, notary escrow account, etc. Details of notary and land registry costs

Does this property fit my budget?

Estimated monthly rate: 1,607€

More accuracy in a few seconds:

By providing some basic information, the estimated monthly rate is calculated individually for you. For this and for all other real estate offers on ohne-makler.net

Based on equity 20% of the purchase price plus the purchase incidental costs / 10 years fixed interest rate / 2% initial repayment / Effective interest rate 4.18%

Details

Condition
As good as new
Number of floors
1
Usable area
8 m²
Bathrooms (number)
2
Bedrooms (number)
2
Number of garages
1
Flooring
Tiles
Heating
Central heating
Year of construction
2006
Equipment
Balcony, Basement, Elevator, Full bath, Shower bath, Fitted kitchen, Guest toilet
Infrastructure
Pharmacy, Grocery discount, General practitioner, Kindergarten, Primary school, Comprehensive school, Public transport

Information on equipment

The entire building makes an extremely well-maintained impression. The building was originally built in 1960 and was renovated in 2007 to become an exclusive residential complex.
An elevator conveniently connects all floors, from the storage room in the basement to the attic. The small, quiet homeowners' association, as well as the attractive staircase, contribute to a pleasant living environment.

Location

The apartment is located in a quiet, dead-end street, offering a particularly relaxed and private living environment. At the same time, you can reach a small Baltic Sea beach and the newly renovated promenade in just 150 meters. Would you like to put your feet in the sand in the morning or enjoy the sunset with an Aperol on the promenade in the evening? Then this is the perfect place for you.

The nearby forest is also within walking distance and offers opportunities for long walks or sporting activities.

Glücksburg is one of the most attractive residential areas on the Baltic Sea and has been gaining popularity for years.

In the surrounding area, you will find an indoor swimming pool, various restaurants, doctors' offices, and a bus line that reliably connects you to Flensburg.

Location Check

Nearby places
Nearby places

Energy

0 50 100 150 200 250 300 350 400 ≥450
Energy certificate type
Consumption certificate
Main energy source
District heating
Energy consumption value
68.00 kWh/(m²a)
Energy consumption for hot water included

Miscellaneous

Broker inquiries not welcome! According to § 7 UWG, unsolicited contact by brokers without the express consent of the recipient is prohibited!

Send a message directly to the seller

Questions about this apartment? Show interest or arrange a viewing appointment?

Click here to send a message to the provider:

Offer from: Ulla Dirks